What 300 financial leaders in construction reveal about protecting project margins, improving cash visibility, and staying ahead of operational drag.

Download the report

Construction business owner reviewing financial reports to grow their business

In Intuit's 2026 Future of Finance survey, construction respondents reported spending more than half their workweek on manual tasks—from reconciling data to exporting reports and correcting errors. That's valuable time that could go toward forecasting cash needs, strengthening bids, and protecting margins on active jobs.

The report explores what sets more connected finance operations apart and where teams can focus to strengthen financial visibility and protect profitability as they grow.

Inside the report, you'll learn:

Four findings behind the profit visibility challenge

MARGIN VISIBILITY

28%

Get automatic margin erosion alerts

Only 28% of surveyed financial leaders in construction receive automatic margin erosion alerts. Most identify margin changes through routine reviews or during or after month-end close.

PROJECT CASH FLOW

36%

Cite change-order lag as the top source of cash surprises

Change-order lag leads the reported sources of unplanned project cash surprises or reconciliation gaps, followed by delayed subcontractor costs.

WIP REPORTING

86%

Report extensive or moderate manual WIP work

Among leaders at construction businesses with $10 million to $50 million in annual revenue, 86% report extensive or moderate manual work calculating WIP and identifying over- or under-billed positions.

MULTI-ENTITY CLOSE

73%

Needed manual close rework

Nearly 3 in 4 multi-entity construction businesses needed intercompany or entity-level rework in at least one of their last three closes.

Source: Intuit's 2026 Future of Finance Survey, construction respondents (N = 300). WIP findings are based on the relevant revenue subgroup within WIP respondents (N = 221 overall). Multi-entity respondents: n = 159.

Margin erosion detection chart for system alerts

Source: Intuit’s 2026 Future of Finance Survey. N = 300. Percentages may not total 100% due to rounding.

Download the full report

Construction finance report layout with workers

Inside the report:
formId
1131
downloadUrl
https://digitalasset.intuit.com/render/content/dam/intuit/erp/en_us/blog/downloadable-assets/scaling-the-construction-finance-stack.pdf
header
Download the report
disclaimer

By requesting this content, you agree that your information will be processed as described in our Global Privacy Statement. By checking this box, you agree to receive phone calls and text messages from Intuit Group about its products and services, which may be sent using automated technology.

Calls and texts may be placed using an automatic telephone dialing system. Consent to be contacted is not a condition of purchase of any goods or services. You can unsubscribe at any time using the links provided in our emails or by texting STOP.

buttonLabel
Download the report
leadLegacyCampaign
MID US IES BDR DIGITAL BLOG MULTI CONSTRUCTIONWP DL FY27Q1

With the old systems before Intuit Enterprise Suite, I’d easily be spending 10–20 hours a week just ensuring that the data was correct.

— Blake Rohm, Controller, Lallier Construction

After moving more of its financial operations into a connected environment with Intuit Enterprise Suite, Lallier Construction reduced peak-period intercompany reconciliation from as many as 20 hours a week to roughly two to four hours.

Customer-reported results are specific to this business. Your results may vary.

About this research

Scaling the Construction Finance Stack draws on Intuit's 2026 Future of Finance Report, fielded online by CatalystMR in May 2026 among 2,000 finance leaders at U.S. businesses with $2.5 million or more in annual revenue. The white paper focuses on 300 construction respondents, including CFOs, controllers, and finance directors, with additional questions covering WIP reporting, margin visibility, cost-overrun detection, project cash timing, and automation readiness. Findings from smaller subgroups should be interpreted directionally. Relationships between variables are correlational and do not establish causation.

A clearer view of project profitability starts here

Explore what 300 financial leaders in construction reveal about margin visibility, cash flow, and the role of connected financial systems in managing complexity as businesses grow.

Download the report

Frequently asked questions

How does financial system integration relate to earlier cost-overrun detection in construction?

Intuit's 2026 Future of Finance survey found that construction finance leaders with highly integrated systems reported more consistent early cost-overrun warnings than those with disconnected systems. The report examines these differences and what they reveal about margin visibility. These findings are correlational and do not establish causation.

How does WIP reporting differ across construction businesses of different sizes?

The survey found substantial differences in work-in-progress (WIP) reporting automation by company revenue. Among businesses with $10 million to $50 million in annual revenue, just 3% reported fully automated WIP reporting, compared with 53% of those with $100 million or more. The report also examines reporting timelines and manual workloads across revenue groups.

What are the biggest threats to profitable growth for construction businesses?

In the survey, 38% of construction finance leaders identified labor productivity as the largest threat to profitable growth, followed by subcontractor risk at 19%. These challenges can affect cost-to-complete forecasts, billing timelines, cash requirements, and projected margins.

How ready are construction finance teams for automated cost alerts?

Only 24% of construction finance leaders said their project data was fully ready to support reliable automated alerts. Another 37% described their data as mostly ready, 26% as somewhat ready, and 13% as not ready. Readiness was assessed based on the reliability of job costs, change orders, subcontractor costs, and approvals.

Who was surveyed for the construction finance report?

Scaling the construction finance stack draws on an Intuit-commissioned online survey conducted by CatalystMR in May 2026 among 2,000 finance leaders at U.S. businesses with $2.5 million or more in annual revenue. The construction sample included 300 respondents with primary or shared responsibility for financial technology and operational decisions. Respondent credentials were verified through computer-assisted telephone interviewing before participation.